1.
Shoring
Open
Close
Timber Frame - Shoring
Pine timber
for shoring
requirements case specific
requirements case specific
2.
Dismantling
Open
Close
Timber Frame - Dismantling
3.
Sill beam installation
Open
Close
Timber Frame - Sill beam installation
Pine timber
for shoring & support
requirements case specific
requirements case specific
Staples
for hammer tacker
4.
Stud & brace installation
Open
Close
Timber Frame - Stud & brace installation
5.
Girt installation
Open
Close
Timber Frame - Girt installation
6.
Post-end replacement
Open
Close
Timber Frame - Post-end replacement
Douglas timber
Possible option for extension
air dried for minimum 5 years
MUST be same wood as post
air dried for minimum 5 years
MUST be same wood as post
7.
Post-end patching (panels in place)
Open
Close
Timber Frame - Post-end patching (panels in place)
Screwdriver
Slotted tip
Pine timber
For template
ca 70 x 150 mm
ca 70 x 150 mm
8.
Post-end patching (panels removed)
Open
Close
Timber Frame - Post-end patching (panels removed)
9.
Timber patching
Open
Close
Timber Frame - Timber patching
10.
Foundation repair
Open
Close
Timber Frame - Foundation repair
Mortar mixing paddle
with M14 connector
Concrete mixing - option B
use with hammer drill
30 kg capacity minimum
use with hammer drill
30 kg capacity minimum
Staples
for hammer tacker
11.
Bricklaying
Open
Close
Timber Frame - Bricklaying
Pine timber
for shoring & support
requirements case specific
requirements case specific